In addition to choosing a good quality crusher, the assembly technology of jaw crusher has always been the top priority. Today, we would like to introduce you in detail how to install the jaw crusher:
1. Since the jaw crusher vibrates a lot during operation, the machine should be installed on a foundation of reinforced concrete structure. The weight of the foundation can be roughly 8-10 times the weight of this machine, and the depth of the foundation should be greater than the depth of the land frozen at that place. The dimensions provided in the foundation drawing are the relative positions of the main machine and motor ground bolts and other parameters related to them, and are not used as construction drawings. The pre-drilled holes must be left at the installation of the ground bolts as the basis for secondary grouting. The height and size of the downcomer slot is decided by the site according to the lower discharge method.
2. In order to reduce the vibration, noise and the impact on the foundation of the nearby buildings, the crusher and the concrete foundation are padded with hardwood pads, rubber bands or other vibration damping materials to play a buffering role in the middle, and then tighten the foundation bolts after the cement of the secondary grouting is solid. Liming Heavy Industry reminds that in these processes must use the level meter to determine the level of the machine, the deviation of the level of the front wall of the frame within the width of the control of 2 mm or less, the inspection of the level of the frame is particularly important, it can ensure that the location of the feed opening is not skewed so that the crusher in the work of one-sided feeding and other phenomena to avoid damage to equipment due to uneven loading.
3. When installing the motor, in addition to checking the distance from the main machine, the motor pulley should also be checked to correspond parallel to the center of the groove pulley of the main machine to ensure that all the v-belts work effectively and consistently.
4. The size of the discharge opening should be adjusted according to the required product size. When adjusting, the T-bolt and tension spring should be loosened first. Use the starting bolt to top off the adjusting seat, insert or withdraw the shims of corresponding thickness, then return the starting bolt, and the adjusting seat will be tightly pressed against the frame lug seat under the self-weight of the moving jaw, while pressing the shim set together. Thereafter, adjust the spring preload pressure. To ensure that the thrust plate and thrust plate pad are tightly pressed together when the machine is working. However, the pre-pressure should not be too large, as long as no machine knocking sound occurs, and finally lock the adjusting seat.
If you plan to configure a crushing and grinding production line, you can leave a message to tell us the equipment you are interested in, what materials you need to crush, and your requirements for output and other aspects, etc. We will arrange professional staff to dock with you. You can also directly click the website customer service, 24 hours online, to provide free consulting services!