Pre-startup Preparation for Jaw Crushers
Jaw crushers are commonly used crushing equipment in industries such as mining and construction materials. Proper operation is one of the key factors ensuring the continuous and normal operation of jaw crushers. Improper operation may reduce the efficiency of jaw crushers and even endanger the lives of operators. The following will introduce the pre-startup preparation work for jaw crushers.
1. Inspect the wear condition of the crushing teeth plates and adjust the size of the discharge opening.
2. Check if there are any minerals inside the crushing chamber. If there are large minerals, they must be removed.
3. Inspect if the connecting bolts are loose.
4. Inspect if the pulley and flywheel guards are complete;
5. Inspect if the tension of the V-belts and cross-rod springs is appropriate.
6. Check the oil level in the oil tank (or dry oil tank) and the integrity of the lubrication system;
7. Check whether the electrical equipment and signal system are functioning normally, etc.
Proper operation of the jaw crusher not only improves production efficiency but also extends the service life of the jaw crusher. Our company manufactures various models of jaw crushers. Click on the website customer service for free consultation immediately, available 24/7.