Take hammer stone crusher as an example.
1. Production line installation requires a certain foundation as a preparation, foundation design should pay attention to the installation distance between the crushing equipment, the retention of the discharge chute, the staggered height range of the equipment, if the mountainous areas can be characterized by the terrain, the specific installation according to the site, the selection of equipment by the technical staff to design the foundation drawings.
2. Foundation design, the slope of the discharge chute can not be less than 50, the installation of electrical equipment to follow the principle of convenient operation, such as the installation of the motor is more for the opposite direction of the inlet, and so on.
3. When installing the hammer machine and other equipment and foundation between the concrete to add hardwood pads or other shock absorbing anti-vibration materials, because the hammer broken by the hammer impact crushing, impact vibration is easy, anti-vibration materials can reduce the vibration of the machine work to affect the surrounding objects, and to reduce the noise has a very good protective effect.
4. Installation position, the motor and rotor shaft level between the degree of extra attention, if not in the horizontal line will occur bearing overheating, wear and tear and other problems, resulting in rapid wear of hammer parts.
5. The design principle of the crushing equipment is that the inlet is on the top and the outlet is on the bottom, so the installation of the site must take this into consideration, and the installation angle and inclination of the belt conveyor should also be taken into account when installing the equipment.
6. After all the equipments are installed, check whether the equipments are installed in place one by one, whether the bolts are loose, and whether the main machine warehouse door is fastened.
7. Before the normal production of the crushing production line, the production line should carry out no-load test run to ensure that each part of the machine operates normally and other unexpected failures occur.
Our company has been focusing on the research and development and manufacturing of large-scale industrial grinding, ore crushing and sand making equipment for more than 30 years, mainly engaged in Raymond Mill, Jaw Crusher, Sand Making Machine, Mobile Crushing Plant, Suspension Mill, Impact Crusher and other products. Has helped many enterprises at home and abroad to design and set up construction waste production line, the production of construction waste mobile crushing plant is flexible and convenient, especially welcome, welcome to consult or visit the plant. Click on the website customer service to consult immediately, 24 hours online.
-
How large size crusher can achieve 400 tons of stone processing an hour
-
What are the requirements for the production of stone for train tracks
-
Raymond mill output will be affected by the four seasons of the weather
-
Environmental protection and energy saving new type raymond mill performance characteristics