Sand and gravel plant with a capacity of 200 tons per hour lapis lazuli production line
A user construction of sand and gravel plant nearly more than ten years, a year ago to visit a friend to see the crusher is running, found very good, because want to expand the scale of sand and gravel production, need to invest in some more equipment, it is recommended by a friend to contact us, and to the plant after a field survey, to determine to reach a cooperation.
Lapis lazuli is a highway, railroad, construction sand and other areas of popular stone, wear-resistant, weathering, no radiation, in the environmental requirements to achieve green, low-carbon production standards, unqualified gravel plant was shut down, shut down, encountered a lack of supply, price surge problem, for friends of the gravel plant is also an opportunity to choose the right equipment, quickly into the state.
The user to deal with the material “lapis lazuli” characteristics, and production requirements “200 tons per hour”, production site conditions, the technical team conducted a reasonable analysis, the first broken recommended PE-750 × 1060 jaw crusher, the second broken recommended PF-1315 impact crusher, the second broken PF-1315 impact crusher, the second broken PF-1315 impact crusher, the second broken PF-1315 impact crusher, the second broken PF-1315 impact crusher. PE-750×1060 jaw crusher for head crusher and PF-1315 impact crusher for second crusher, with an hourly output of 200 tons of lapis lazuli, were contracted by these two types of equipment.
In the regular return visit, he said that the harvest is good for more than a year, 200 tons per hour lapis lazuli production line program host equipment with a reasonable coarse crushing, fine crushing, a good combination of easy to reach the output requirements, a reasonable layout of the equipment, but also effectively reduce the cost of investment, intelligent operating system, to protect the equipment safety, stable operation, the finished product of the lapis lazuli particle size is excellent, less crushing, grading is also more reasonable, to meet the standards of the materials used in the construction project, and the whole operation is basically no dust, no dust, no dust. The whole operation is basically no dust, noise generation, to realize the green environmental protection production.
In addition to the main equipment, such as vibrating feeder, circular vibrating screen, conveyor, etc. These are also indispensable, are you ready? If you need a full set of equipment, we have a technical team to help free selection, design and production programs, while the later distribution, delivery, on-site installation, operation and commissioning of a series of processes, there are perfect service to ensure that the user's personal interests. Free click online customer service to contact the sales manager, for you to arrange the nearest inspection, and equipment are sold directly, the price is very favorable Oh.