Home > ShowRoom > How much to invest in 600000 tonnes per year mechanism sand project
How much to invest in 600000 tonnes per year mechanism sand project

How much to invest in 600000 tonnes per year mechanism sand project

In recent years, all infrastructure construction has been booming, and the demand for sand and gravel aggregate continues to rise. In the natural river sand, sea sand and other resources are in short supply, limiting the mining environment, how much is
Send Inquiry
Product Details

In recent years, all infrastructure construction has been booming, and the demand for sand and gravel aggregate continues to rise. In the natural river sand, sea sand and other resources are in short supply, limiting the mining environment, how much is the annual output of 600,000 mechanism sand project investment? Here for everyone to do a detailed introduction.


The prerequisite for starting a mechanism sand plant is to comply with national laws and regulations and standards, to apply for the relevant legal procedures (5 valid documents and 1 business licence, different countries and regions are different), as well as environmental protection measures to be prepared, the relevant materials are prepared, and after the preparation, the mechanism sand project is quickly passed through the approval.


Sand making plant is mainly to make the large degree of stone to meet the demand for construction sand, what equipment do I need to use? To combine the size of raw materials, production, and also consider the site conditions, investment budget and other aspects, to reasonably design the production programme.


How much do you need to invest to start a 600,000 tonnes per year mechanism sand plant? According to the market understanding, usually the investment cost ranges from *0-*00 million yuan, depending on the actual sand production line equipment configuration, site, late labour costs and utility costs.

1. It depends on what raw materials are used to make sand, and then determine the cost of raw materials, usually in the range of 5-15 yuan / tonne;

2. Buy a set of sand production line equipment prices in the 60-8 million or so, environmental protection device investment of thousand to ten thousand yuan or so.

3. Labour force of about 5-10 people, production site of about 3-5 acres, and water, electricity consumption at cost price (policy preferential), the cost of about 8-15 million yuan / month;

4. The cost of the relevant documents in the early stage, as well as logistics, maintenance costs and other costs, but also almost more than 10,000 yuan.


Specific investment in an annual output of 600,000 tonnes of mechanism sand project how much money is needed, you can always click on the online inquiry to understand, you can also directly place an order by phone to enjoy the ex-factory price concessions, there are sales managers at your service, free access to information such as investment analysis, revenue analysis, plant construction programme, etc., to answer the mechanism sand project of a variety of doubts.

Related Showrooms
Inquiry

Copyright © Shanghai Industry Co., Ltd. All Rights Reserved.