Avoid cone crusher blockage to improve production
Although the cone crusher is a tiger mouth, but also in the production time will be blocked material, there are many operators in the production time think that the cone crusher feed opening is relatively large, in order to increase the output, so the production of the material, but do not know that in fact the cone crusher is also easy to block the material, and the cone crusher is very troublesome after the blockage, usually stuck between the two jaw plates, when the cone crusher When the cone crusher is blocked during the working process, there is no other way but to stop the work to remove the blocked material. The best way to solve the jamming problem is to take measures to prevent the jamming problem from happening. This will reduce the downtime and extend the normal working time, thus increasing the efficiency.
An audible and visual indicator can be used to directly indicate the feed. Because the running current of the belt conveyor in crushing is related to the amount of material in the lower chamber, every time there is more material in the lower chamber, it is easy to cause the cone crusher to jump to a stop. Therefore, according to the current characteristics of the plate conveyor, a solution is developed, i.e., an electric bell and an alarm flashing light are installed at the feeding port of the cone crusher, which is directly connected to the relay in the electrical cabinet. When the plate conveyor reaches a set current value, the The relay will be activated, the light will start flashing and the bell will ring. If the downstream equipment jumps to a stop and the current of the plate conveyor is zero, the sound and light alarm will also be indicated. At this time, stopping the feeding can prevent the cone crusher from blocking the material. Therefore, you should pay special attention to the operation matters when using the cone crusher to avoid blockage.
The cone crusher is also a mechanical device, if it is not operated normally, there will be problems, once there is a blockage, then the production can be large, because this is the opposite, it will waste a lot of time in repairing the equipment.
Choose us, our professional team will configure the most suitable production line for you, there will also be professional and technical personnel to guide the installation and use, welcome to consult customer service to buy, provide 24-hour free consulting services.